In 2002, a new 400 m² MULTIBETON floor heating system was installed in the BRE Bank in Katowice by MB-Specialists BAJ and JARBUD under the direction of Multitherm Polska. The MB-Estrichsystem is partly supported by an MB wall system which lowers the flow temperature, thus increasing heating economy. Tiles were selected as final floor covering.
MULTIBETON Specialists:
JARBUD and BAJ, PL-Sosnowiec