Pagitsch GmbH, which is headquartered in Tamsweg Austria, has recently equipped its second production hall with a MULTIBETON floor heating system. The company's dry construction and stucco programs are located here. Production includes stucco work, gypsum plasterboard box walls, acoustic and gypsum ceilings, movable separating walls, and diverse other products including metal panel ceilings, grid ceilings, and mineral fibre ceilings.
GSL Lüftenegger Ges.m.b.H., MULTIBETON Partners, installed this floor heating system in three stories covering 1500 m². MB-Euro-System conduit 17 was used, and MB-Estrichsystem 17 was applied, system-wise, in conjunction with flowing screed.
The GSL Lüftenegger Company specializes in floor heating systems and in solar and alternative energies. Additionally, they are competent partners in all aspects relating to gas, water, heating and sanitation.
MULTIBETON Specialists:
GSL Lüftenegger Ges.m.b.H.
A-5580 Unternberg 153
Telephone: 06 474 / 69 63
Telefax: 06 474 / 62 62